1.
Alrasyid KA, Ariestadi D. Conceptual Cost Estimation (CCE) Analysis for The Construction of Additional Joint Lecture Building (GKB 3) at State University of Malang. jist [Internet]. 2025Jan.29 [cited 2025Aug.2];6(1):528-36. Available from: https://jist.publikasiindonesia.id/index.php/jist/article/view/8790