1.
Alrasyid KA, Ariestadi D. Conceptual Cost Estimation (CCE) Analysis for The Construction of Additional Joint Lecture Building (GKB 3) at State University of Malang. jist [Internet]. 2025Jan.29 [cited 2026Apr.20];6(1):570-8. Available from: https://jist.publikasiindonesia.id/index.php/jist/article/view/8790