1.
Aprilia I, Pontan D. Cost and Time Efficiency Analysis on Latei Beams and Wall Work: Case Study Of GLT4 And GKU2 Projects at Sumatra Institute of Technology. jist [Internet]. 2023Dec.25 [cited 2024Nov.21];4(12):2510-5. Available from: https://jist.publikasiindonesia.id/index.php/jist/article/view/715