Warning: file_put_contents(/home/jist.publikasiindonesia.id/public_html/cache/fc-pluginSettings-1-defaultthemeplugin.php): failed to open stream: Operation not permitted in /home/jist.publikasiindonesia.id/public_html/lib/pkp/classes/cache/FileCache.inc.php on line 90
1.
Roganda Simbolon, Doarjo Simbolon, Paris Johannes Ginting. Perancangan Interval Perawatan Mesin Secara Preventive Maintenance Dengan Metode Reliability Centered Maintenance II (RCM II) Studi Kasus : PT. Gunung Selamat Lestari. jist [Internet]. 2020Oct.21 [cited 2026Sep.26];1(03):210-21. Available from: https://jist.publikasiindonesia.id/index.php/jist/article/view/23