Warning: file_put_contents(/home/jist.publikasiindonesia.id/public_html/cache/fc-pluginSettings-1-defaultthemeplugin.php): failed to open stream: Operation not permitted in /home/jist.publikasiindonesia.id/public_html/lib/pkp/classes/cache/FileCache.inc.php on line 90
Roganda Simbolon, Doarjo Simbolon, and Paris Johannes Ginting. “Perancangan Interval Perawatan Mesin Secara Preventive Maintenance Dengan Metode Reliability Centered Maintenance II (RCM II) Studi Kasus : PT. Gunung Selamat Lestari”. Jurnal Indonesia Sosial Teknologi 1, no. 03 (October 21, 2020): 210–221. Accessed September 26, 2026. https://jist.publikasiindonesia.id/index.php/jist/article/view/23.