Sidik, A. “Seepage Handling Using Secant Pile As a Solution to Replace Curtain Grouting and Dam Stability Evaluation to Optimize Work on the Margatiga Dam Construction Project”. Jurnal Indonesia Sosial Teknologi, vol. 5, no. 4, Apr. 2024, pp. 1888-03, doi:10.59141/jist.v5i4.1041.