[1]
D. Triatmojo, H. Pratiwi Adi, and H. Poedjiastoeti, “Risk Factor Analysis on Contingency Costs of Phase I Wastewater Network Project in Bogor City”, jist, vol. 6, no. 2, pp. 882–896, Feb. 2025.