[1]
K. A. Alrasyid and D. Ariestadi, “Conceptual Cost Estimation (CCE) Analysis for The Construction of Additional Joint Lecture Building (GKB 3) at State University of Malang”, jist, vol. 6, no. 1, pp. 528–536, Jan. 2025.