Warning: file_put_contents(/home/jist.publikasiindonesia.id/public_html/cache/fc-pluginSettings-1-defaultthemeplugin.php): failed to open stream: Operation not permitted in /home/jist.publikasiindonesia.id/public_html/lib/pkp/classes/cache/FileCache.inc.php on line 90
Roganda Simbolon, Doarjo Simbolon and Paris Johannes Ginting (2020) “Perancangan Interval Perawatan Mesin Secara Preventive Maintenance Dengan Metode Reliability Centered Maintenance II (RCM II) Studi Kasus : PT. Gunung Selamat Lestari”, Jurnal Indonesia Sosial Teknologi, 1(03), pp. 210–221. doi: 10.59141/jist.v1i03.23.