Sidik, Ahmad. 2024. “Seepage Handling Using Secant Pile As a Solution to Replace Curtain Grouting and Dam Stability Evaluation to Optimize Work on the Margatiga Dam Construction Project”. Jurnal Indonesia Sosial Teknologi 5 (4):1888-1903. https://doi.org/10.59141/jist.v5i4.1041.