SYAFRIANDY, S. Comparative Study Of Conventional And Precast Methods From The Cost Side (Case Study On Batang III Industrial Worker Flats Construction Project). Jurnal Indonesia Sosial Teknologi, [S. l.], v. 4, n. 12, p. 2354–2362, 2023. DOI: 10.59141/jist.v4i12.699. Disponível em: https://jist.publikasiindonesia.id/index.php/jist/article/view/699. Acesso em: 23 nov. 2024.