[1]
Triatmojo, D., Pratiwi Adi, H. and Poedjiastoeti, H. 2025. Risk Factor Analysis on Contingency Costs of Phase I Wastewater Network Project in Bogor City. Jurnal Indonesia Sosial Teknologi. 6, 2 (Feb. 2025), 882–896. DOI:https://doi.org/10.59141/jist.v6i2.8856.