[1]
Sidik, A. 2024. Seepage handling using secant pile as a solution to replace curtain grouting and dam stability evaluation to optimize work on the Margatiga Dam construction project. Jurnal Indonesia Sosial Teknologi. 5, 4 (Apr. 2024), 1888–1903. DOI:https://doi.org/10.59141/jist.v5i4.1041.